Skip to main content

SOC 2 Cost

SOC 2 Cost for Cloud Infrastructure

Estimate SOC 2 cost for platforms, IaaS/PaaS providers, and infrastructure-heavy products with shared services.

Cost range and timeline snapshot

  • Typical first-year range: ~$40k–$110k depending on platform breadth and evidence maturity.
  • Tooling: logging/metrics, vulnerability management, EDR, and ticketing sized by host/service count.

Timeline bands

  • Readiness: 10–16 weeks if inventories, tagging, and runbooks are in place.
  • Type I: 4–8 weeks once shared services and tenant controls are evidenced.
  • Type II: add 6–12 months observation with sampling across key services and regions.

Assumptions

  • Shared control planes and multi-tenant infrastructure with clear boundary controls.
  • Backups, DR, and availability zones defined with evidence of testing.
  • Runbooks and on-call processes documented for incidents and customer impact.

Common scope

  • Control plane, shared services, customer workloads boundaries, backups/DR.
  • Identity and access for operators, least-privilege roles, break-glass patterns.
  • Logging/monitoring, alerting, incident response, and change management flows.

Top cost drivers

  • Clarity of shared responsibility and how customer isolation is enforced.
  • Depth of observability (logs/metrics/traces) with alert routing and response.
  • Frequency of infrastructure changes and region/service expansion during audit.
  • Vendor and subprocessors supporting the platform (e.g., DNS, auth, payments).

What auditors focus on

  • Access controls to production and customer environments with approvals and reviews.
  • Backup/restore evidence, DR testing, and resilience patterns.
  • Change windows, infrastructure-as-code reviews, and separation of duties.
  • Incident response readiness and communication to customers.

What changes cost most

  • Late changes to network boundaries or tenancy models that require re-walkthroughs.
  • Incomplete logging/monitoring coverage across shared services.
  • DR/backup testing gaps that need remediation before Type I sign-off.

Example scenarios

Single-region platform

Lean scope with focused services; lower range if logging and access reviews are strong.

Multi-region rollout

Cross-region replication and DR testing expand sampling; budget mid-to-upper range.

Platform with customer-managed components

Shared responsibility clarity and support processes increase walkthrough depth.